Items where Division is "Civil Engineering (Bachelor's Degree)" and Year is 2023

Group by: No Grouping | Date
Number of items: 13.

ANALISA FAKTOR- FAKTOR PENGARUH KERUSAKAN PERKERASAN LENTUR JALAN (STUDI KASUS : JALAN PRABU GAJAH AGUNG,PERSIMPANGAN BOJONG).

ANALISA PELAKSANAAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG.

ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK PEMBANGUNAN GEDUNG PARKIR POLDA JABAR.

ANALISIS KEKUATAN STRUKTUR JETTY EKSISTING (STUDI KASUS: JETTY PELABUHAN BAING NUSA TENGGARA TIMUR).

ANALISIS KEMACETAN LALU LINTAS DI RUAS JALAN IBRAHIM ADJIE DI BAWAH FLYOVER KIARACONDONG.

ANALISIS NILAI HASIL TERHADAP WAKTU PADA PROYEK KONTRUKSI MENGGUNAKAN METODE EARNED VALUE ANALYSIS.

ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE CRASHING (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG DIREKTORAT RESERSE KRIMINAL UMUM DAN DIREKTORAT RESERSE KRIMINAL KHUSUS POLDA JAWA BARAT).

(ANALISIS TEBAL PERKERASAN LENTUR MENGGUNAKAN METODE MANUAL DESAIN PERKERASAN 2017 DAN AUSTROADS 2017 (STUDI KASUS : JALAN SOEKARNO HATTA, SIMPANG GEDEBAGE-BUNDARAN CIBIRU).

ANALISIS TINGKAT KEPUASAN PENUMPANG DALAM PERJALANAN KERETA API LOKAL BANDUNG RAYA RUTE PADALARANG – CICALENGKA DAN SEBALIKNYA DENGAN METODE SERVICE QUALITY.

DATABASE JALAN LINGKUNGAN BERBASIS SISTEM INFORMASI GEOGRAFIS DI SWK CIBEUNYING KOTA BANDUNG.

EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN MENARA DENGAN PENDEKATAN METODE EARNED VALUE (STUDI KASUS: PROYEK PEMBANGUNAN MENARA KUJANG SAPASANG PANENJOAN JATIGEDE, KABUPATEN SUMEDANG).

MIKROSIMULASI LALU LINTAS PADA PERLINTASAN SEBIDANG DENGAN MENGGUNAKAN PROGRAM PTV VISSIM (STUDI KASUS: JALAN NURTANIO – JALAN ABDUL RAHMAN SALEH - BANDUNG).

“PENERAPAN METODE EARNED VALUE ANALYSIS TERHADAP WAKTU PENJADWALAN (STUDI KASUS : PROYEK PEMBANGUNAN REVITALISASI PASAR PUSAKANAGARA KABUPATEN SUBANG)”.

This list was generated on Mon Sep 15 14:42:52 2025 WIB.