Items where Subject is "TA Engineering (General). Civil engineering (General)"

Jump to: Thesis
Number of items at this level: 14.

Thesis

ANALISA EFISIENSI RENCANA ANGGARAN BAHAN DAN BIAYA PEMBUATAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) INDIVIDU DAN KOMUNAL.

ANALISA KINERJA BIAYA DAN WAKTU PROYEK DENGAN MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT BHAYANGKARA SARTIKAASIH BANDUNG).

ANALISIS KEKUATAN STRUKTUR JETTY EKSISTING (STUDI KASUS: JETTY PELABUHAN BAING NUSA TENGGARA TIMUR).

ANALISIS NILAI HASIL TERHADAP WAKTU PADA PROYEK KONTRUKSI MENGGUNAKAN METODE EARNED VALUE ANALYSIS.

(ANALISIS TEBAL PERKERASAN LENTUR MENGGUNAKAN METODE MANUAL DESAIN PERKERASAN 2017 DAN AUSTROADS 2017 (STUDI KASUS : JALAN SOEKARNO HATTA, SIMPANG GEDEBAGE-BUNDARAN CIBIRU).

EVALUASI DAN ANALISIS KAPASITAS DAN DEBIT ANDALAN KOLAM RETENSI SEBAGAI UPAYA PENGENDALIAN BANJIR DAN PENYEDIAAN AIR BERSIH DI WILAYAH KAWASAN ASET CIPERNA (ROYAL GOLF CIREBON).

EVALUASI EFEKTIVITAS WAKTU DAN BIAYA PADA PELAKSANAAN PROYEK KONSTRUKSI MENGGUNAKAN METODE CRASHING.

EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN MENARA DENGAN PENDEKATAN METODE EARNED VALUE (STUDI KASUS: PROYEK PEMBANGUNAN MENARA KUJANG SAPASANG PANENJOAN JATIGEDE, KABUPATEN SUMEDANG).

EVALUASI PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE EARNED VALUE.

IDENTIFIKASI KAPASITAS RUAS JALAN LETJEN IBRAHIM ADJIE STA. 3 +100 DI PERLINTASAN SEBIDANG KERETA API KOTA TASIKMALAYA.

KAJIAN NERACA AIR DAERAH IRIGASI CIHERANG KABUPATEN BANDUNG PROVINSI JAWA BARAT.

“PENERAPAN METODE EARNED VALUE ANALYSIS TERHADAP WAKTU PENJADWALAN (STUDI KASUS : PROYEK PEMBANGUNAN REVITALISASI PASAR PUSAKANAGARA KABUPATEN SUBANG)”.

PERANCANGAN STRUKTUR DERMAGA DECK ON PILE PELABUHAN SOFYANIN, KABUPATEN KEPULAUAN TANIMBAR, PROVINSI MALUKU.

PERCEPATAN WAKTU PROYEK PELAKSANAAN DENGAN METODE CRASHING. (Studi Kasus : Proyek Pembangunan Lapangan Indoor Dan Out Door Sport Tangerang).

This list was generated on Sat Nov 1 04:55:36 2025 WIB.