EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN MENARA DENGAN PENDEKATAN METODE EARNED VALUE (STUDI KASUS: PROYEK PEMBANGUNAN MENARA KUJANG SAPASANG PANENJOAN JATIGEDE, KABUPATEN SUMEDANG).
Jurnal Sidik Permana Putra T. Sipil2.pdf - Other
Download (354kB)
TA Sidik Permana Putra NPM. 4122321110016 07.11.23.pdf - Other
Restricted to Registered users only
Download (8MB)
| Item Type: | Thesis |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Depositing User: | Mrs. Ineu Nuraeni, S.Sos |
| Date Deposited: | 14 Apr 2025 03:30 |
| Last Modified: | 14 Apr 2025 03:30 |
| URI: | https://repo.unwim.ac.id/id/eprint/380 |


